1) Pipe calibration & deburing
This is an essential operation to be performed before inserting the tail into the pipe.
2)
Mounting the fitting
Ensure that the pipe is fully insert into the fitting.
3) Pressing the fitting
Pressing operation using Jaw suitable for the following diameters.
4) Finished product
The use of mufti layer pipeworkinstallation time by up to 45% in comparison tosteel, galvanized iron, copper or PP-R, |